DI-ATTS-80360A
Energy Monitoring and Control Systems (EMCS) Factory Test Plan
The Factory Test Plan defines all tests required to ensure the EMCS meets technical, operational, and performance requirements and supports in-process review of factory testing.
Approval DateFebruary 10, 1994
AMSC NumberN6989
Preparing Activity—
Project Number—
OPRYD1
DTIC Applicable—
GIDEP Applicable—
Limitation—
Applicable Forms—
Approval Limitation—
Form VersionAPR 89
DID Formatdd_form_1664
963C CompliantNo
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Related
DI-ATTS-80361ADI-ATTS-80362A
Description & Purpose
3.1 The Factory Test Plan defines all the tests required to ensure that the EMCS meets technical, operational, and performance requirements.
3.2 The Factory Test Plan will be used for an in-process review of the factory testing to ensure that the proper tests, procedures, and equipment are used for the Factory Test.
Application & Interrelationship
7.1 This DID contains the format and content preparation instructions for the Factory Test Plans required by paragraph 4.2 of MIL-STD-2202A.
7.2 This DID is related to DI-ATTS-80361A, EMCS Factory Test Procedures; and DI-ATTS-80362A, EMCS Factory Test Reports.
7.3 This DID supersedes DI-ATTS-80360.
Preparation Instructions
10.1Format.The Factory Test Plan shall be in the contractor's format.
10.2Content.The test plan shall contain the following:
10.2.1Factory Test Equipment block diagram.
10.2.2System hardware description.
10.2.3System software description.
10.2.4Operator's commands.
10.2.5I/O summary tables with failure modes for test points.
10.2.6Required passwords for each operator access level.
10.2.7Description of each type of digital I/O and analog I/O to be used in the test data base.
10.2.8List of test equipment.
10.2.9Surge and overvoltage protection circuits diagrams.
10.2.10For each application program shown in the I/O summary table, the plan shall include:
10.2.10.1Inputs required for each program (I/O point values and status) and corresponding expected results for each set of input values.
10.2.10.2Default values for the program inputs not implemented or provided for in the contract documents for the application programs to be tested.
10.2.10.3Failure modes for each I/O function to be tested.
10.2.11Milestones for test exercises.
10.2.12Identification of simulation programs, equipment, personnel, and facilities required.
10.2.13Identification of capabilities and functions to be tested, including values and situations that comprise the test.
10.2.14Identification of all areas where physical and functional details of the system to be tested differ from the generic system, including explanations of the differences.