The HEMP System Verification Test Plan documents the test-execution, data-recording, analysis, inspection, and reporting procedures used to verify an aircraft's HEMP protection subsystem in accordance with MIL-STD-3023A.
The HEMP System Verification Test Plan applies to MIL-STD-3023A, High-Altitude Electromagnetic Pulse (HEMP) Protection for Military Aircraft. DI-EMCS-81846, HEMP Test Plan for System Verification Test, is hereby cancelled and superseded by DI-EMCS-81846A. This data item description (DID) contains the format, content, and intended-use information for the data deliverable resulting from the verification test tasks described in MIL-STD-3023A sections 4.7.3 and 5.7.3 and in Appendix D, as applicable.
The purpose of verification-testing the aircraft's HEMP protection subsystem (HPS) is to demonstrate that the installed protection provides the required HEMP hardness. These tests are performed after the HPS has passed performance testing (in accordance with Appendix C of MIL-STD-3023A) and after the equipment is installed and functioning to determine if the operational system suffers mission-aborting damage or upset due to simulated HEMP excitations. Verification is normally a Government-conducted test and is not part of an aircraft construction contract.
The HEMP System Verification Test Plan describes the test-execution, data-recording, analysis, inspection, and reporting procedures to be used by the contractor to perform the verification testing. The plan provides the means for the Government to understand and duplicate methods used by the contractor to demonstrate the HPS' compliance with respect to MIL-STD-3023A's verification test pass and fail requirements. The Department of Defense's (DoD's) HEMP certification authority requires that a documented verification test plan be submitted as part of a HEMP certification request package for an aircraft.
If a portion of the HPS' components has already been tested by a previous test program, then the documentation of those previous tests, including plans, reports, and test data, is attached as an appendix to the HEMP System Verification Test Plan.
This DID supersedes DI-EMCS-81846.