DI-ENVR-80708A
Shock Test Report
The Shock Test Report documents the results of equipment shock tests, post-shock inspections, and functional tests performed under MIL-DTL-901 standard shock test methods.
Approval DateJuly 23, 2019
AMSC NumberN10054
Preparing ActivitySH
Project NumberENVR-2019-004
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The Shock Test Report provides the results of equipment shock tests, post-shock test inspections, and functional tests when equipment is subjected to the standard shock test methods in MIL-DTL-901. The report is used to determine whether tested items meet the requirements of MIL-DTL-901.
a. This data item description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in 3.1.8.7, 3.1.12, and 6.7.2 of MIL-DTL-901.
This report applies to shock testing equipment in accordance with MIL-DTL-901.
Sections 1 and 2 of the report will include input provided by the shock test facility and the activity performing post-shock test inspection. If the shock test facility and post-test inspection facility are other than the contractor, arrangements to ensure that this input is obtained are required.
b. Test reports for alternate shock test vehicles/machines shall be as required by the Technical Authority.
c. This DID supersedes DI-ENVR-80708.
Preparation Instructions
1Reference Documents.The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2Format.The test report shall be in the contractor's format.
3.1Distribution Statement.When information within the Shock Test Report constitutes Scientific and Technical Information (STINFO), as defined by DoDI 5230.24, the test report shall be marked with the appropriate distribution statement as assigned by the Technical Authority in accordance with DoDI 5230.24.
3.2General Requirements.The test report shall contain the following three sections:
3.2.1Section 1: Test installation and conduct.This section describes the test installation, conduct, and results of the test, including the applicable information of 3.3 below. This section shall also include:
3.2.1.1Description of the material, size, and type of hold-down boltsDescription of the material, size, and type of hold-down bolts (and of any other hold-down or locating devices) used to secure or locate the tested items to their foundations or test fixtures during shock tests.
3.2.1.2Clear photographs of each equipment mounting configurationClear photographs of each equipment mounting configuration used during the shock test.
3.2.1.3Drawings of the fixtures, including all modifications to standard fixtures.The modifications to the standard fixtures may be included as marked-up drawings.
3.2.1.4If shock test instrumentation is employedIf shock test instrumentation is employed, a description of such instrumentation and a clear copy of data recorded during the test.
3.2.1.5Reference to the applicable equipment military specifications or acquisition documentReference to the applicable equipment military specifications or acquisition document, including the applicable revision and date of issue.
3.2.2Section 2: Post-test inspection.This section describes the conduct and results of the post-test inspection, including the applicable information in 3.3 below.
3.2.3Section 3: Acquisition requirements.This section states the applicable acquisition requirements and supplemental ordering data specified in the acquisition documents in accordance with 6.2 of MIL-DTL-901. This may be accomplished by extracting pertinent pages or sections of the purchase specifications or acquisition document and including this material as an appendix to the report. This section shall include the contractor's recommendations for shock test acceptance of the item tested. For each item of damage (or malfunction) that occurred as a result of shock testing, at least one of the following shall be included:
Where matters involving shock test failures were resolved with the Technical Authority prior to submission of the test report (see 3.1.12 of MIL-DTL-901), a record of these agreements shall include detailed descriptions of any damage incurred during each blow, shot, or drop and, where practicable, clear photographs of each instance of damage. This section shall also describe in detail any design modifications, repairs, or adjustments made to the item during shock tests or prior to post-test functional testing and shall provide the equipment identification information delineated in 3.3.5 below.
3.2.3.1Recommendation and rationale for design modificationsRecommendation and rationale for design modifications believed to be required to correct any deficiencies found during the test or the post-test inspection to achieve acceptable shock resistance.
3.2.3.2Illustration that the damage or malfunction in question does not violate applicable shock test acceptance criteria.
3.3Specific Requirements.Each piece of equipment to be tested shall be identified with the information delineated in 3.3.6 below. Tests shall be numbered and dated.
3.3.1Lightweight Shock Machine Test.The following information shall be included for all lightweight shock machine tests as defined by MIL-DTL-901:
3.3.1.1Type of test fixture as defined by MIL-DTL-901.
3.3.1.1.1If using type 4C, indicate the mounting platform.
3.3.1.1.2If using type 6E, indicate the panel number.
3.3.1.1.3If nonstandard, provide photographs.
3.3.1.2Total weight supported by the lightweight shock machine anvil plate.
3.3.1.4Monitored performance.See table I for a sample tabulation format for required information.
3.3.1.4.4Operating condition
3.3.1.4.5Reference measurements
3.3.1.4.6Post-test measurements or corrections
3.3.1.5Survey findings, noting any damage and providing damage photographs.
3.3.1.6Modifications, if any, accomplished prior to or during test with applicable rationale, description, etc.
3.3.1.7If witnessed by a designated Government representativeIf witnessed by a designated Government representative, the report shall include the signature of the witness and certification that the results were accurately recorded. The Government representative signature and certification do not indicate approval or acceptance of the test report.
3.3.1.8Certification of report by the test laboratory.
3.3.2Medium Weight Shock Machine Test.The following information shall be included for all medium weight shock machine tests as defined by MIL-DTL-901:
3.3.2.1Type of test fixture.If nonstandard, include description and photographs.
3.3.2.2Total weight supported by the medium weight shock machine anvil tableTotal weight supported by the medium weight shock machine anvil table in accordance with 3.1.2.b of MIL-DTL-901.
3.3.2.3Medium weight shock machine mounting requirementsMedium weight shock machine mounting requirements in accordance with 3.1.6.3.2 of MIL-DTL-901.
3.3.2.5Monitored performance.See table II for a sample tabulation format for required information.
3.3.2.5.4Operating condition
3.3.2.5.5Reference measurements
3.3.2.5.6Post-test measurements or conditions
3.3.2.6Survey findings, noting any damage and providing damage photographs.
3.3.2.7Modifications, if any, accomplished prior to or during test with applicable rationale, description, sketches, etc.
3.3.2.9If witnessed by a designated Government representativeIf witnessed by a designated Government representative, the report shall include the signature of the witness and certification that the results were accurately recorded. The Government representative signature and certification do not indicate approval or acceptance of the test report.
3.3.2.10Certification of the report by the test laboratory.
3.3.3Heavyweight Shock Test on a Standard Floating Shock Platform (FSP), Extended FSP (EFSP), Intermediate FSP (IFSP), or a Large FSP (LFSP).The following information shall be included for all FSP tests as defined by MIL-DTL-901:
3.3.3.1Test platform as defined by MIL-DTL-901.
3.3.3.1.1Standard FSP or EFSP
3.3.3.2Test fixture description, including details of the installations.Photographs or sketches of the foundation and installation.
3.3.3.3Total weight on the platform.
3.3.3.5Monitored performance.See table III for a sample tabulation format for required information.
3.3.3.5.2Charge standoff (range) and deck simulating fixture (DSF) frequencyCharge standoff (range) and deck simulating fixture (DSF) frequency, as necessary, in accordance with MIL-DTL-901
3.3.3.5.3Operating condition
3.3.3.5.4Reference measurements
3.3.3.5.5Post-test measurements or conditions
3.3.3.6Survey findings, noting any damage and providing damage photographs.
3.3.3.7Modifications, if any, accomplished prior to or during test with applicable rationale, description, sketches, etc.
3.3.3.9If witnessed by a designated Government representativeIf witnessed by a designated Government representative, the report shall include the signature of the witness and certification that the results were accurately recorded. The Government representative signature and certification do not indicate approval or acceptance of the test report.
3.3.3.10Certification of the report by the test laboratory.
3.3.4Deck Simulating Shock Machine (DSSM) Test.The following information shall be included for all DSSM tests as defined by MIL-DTL-901:
3.3.4.1Description of test fixture, if used, including figure(s)Description of test fixture, if used, including figure(s) (drawings, sketches, photographs, etc.).
3.3.4.2Class II payload center-of-gravity (CG), total isolated payload weight, and fixture weight plus additional weight.
3.3.4.4Monitored performance.See table IV for a sample tabulation format for required information.
3.3.4.4.2Test orientation
3.3.4.4.3Drop height (inches)
3.3.4.4.4Swing arm settings, measured from the horizontal
3.3.4.4.5Tray configuration
3.3.4.4.6Operating condition
3.3.4.4.7Reference measurements
3.3.4.4.8Post-test measurements or conditions
3.3.4.5Survey findings, noting any damage and providing damage photographs.
3.3.4.6Modifications, if any, accomplished prior to or during test with applicable rationale, description, sketches, etc.
3.3.4.8If witnessed by a designated Government representativeIf witnessed by a designated Government representative, the report shall include the signature of the witness and certification that the results were accurately recorded. The Government representative signature and certification do not indicate approval or acceptance of the test report.
3.3.4.9Certification of the report by the test laboratory.
3.3.5Post-Shock Test - Testing and Inspection.The following information shall be included for all tests:
3.3.5.1Identification of item being inspectedIdentification of item being inspected through the use of such information as component name, manufacturer, and drawing number.
3.3.5.2Type of shock test performed.
3.3.5.3Inspection and functional tests.Type of test accomplished and approval by the appropriate inspectors.
3.3.5.4Repairs that were necessary during test.
3.3.5.5Condition of the item being tested/inspected.
3.3.5.5.7Momentary malfunction
3.3.5.6Comparison with operational requirements.Report the results of the comparison of the specified test item operational requirements prior to the test with the results of the post-shock functional testing.
3.3.5.7Disposition of unit.
3.3.5.8If witnessed by a designated Government representativeIf witnessed by a designated Government representative, the report shall include the signature of the witness and certification that the results were accurately recorded. The Government representative signature and certification do not indicate approval or acceptance of the test report.
3.3.5.9Certification of the report by the test laboratory.
3.3.6Equipment Identification and Test Installation Requirements.The following information shall be included for all tests:
3.3.6.1.6Military specification and technical manual numbers
3.3.6.2Manufacturer (name and address).
3.3.6.3Model number, part number, and serial number (as applicable).
3.3.6.4Size or capacity (if applicable).
3.3.6.5Plan numbers (sectional assembly and outline; revision and date).
3.3.6.6Approximate overall size of equipment.
3.3.6.7Weight (wet, dry, and total weight including test fixture, wet and dry).
3.3.6.8Height of CG above base of equipment.
3.3.6.9Contract or purchase order number.
3.3.6.10Requirements of MIL-DTL-901 (see classifications in 1.2 of MIL-DTL-901).
3.3.6.10.4Equipment class
3.3.6.10.5Shock test type
3.3.6.10.6Mounting location and ship type
3.3.6.10.7Mounting plane aboard ship represented during shock test
3.3.6.10.8Mounting orientation aboard ship represented during shock test
3.3.6.11Hold-down bolts (and any other hold-down or locating devices) used for attachment of items to their foundation or test fixture during shock tests.
3.3.6.12Hold-down bolt torque.
3.3.6.13Description of external or internal resilient mounts, if used.
3.3.6.13.5Mount manufacturer
3.3.6.14Major components and attached items in test (name, identification, manufacturer).
3.3.6.15Test laboratory and address.
Figures

Figure Table I. Lightweight shock machine test monitored performance.

Figure Table II. Medium weight shock machine test monitored performance.

Figure Table III. Heavyweight shock test monitored performance.

Figure Table IV. Deck simulating shock machine test monitored performance.
Schema v3.0Community-maintained · Verify against ASSIST