DI-HFAC-80743B
Human Engineering Test Plan
The Human Engineering Test Plan details the proposed testing to demonstrate that the personnel-equipment/software combination can accomplish the intended operation and maintenance functions in accordance with system specifications.
Approval DateJuly 8, 1998
AMSC NumberA7317
Preparing Activity—
Project Number—
OPRA/AMCOM
DTIC Applicable—
GIDEP Applicable—
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatdd_form_1664
963C CompliantNo
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The Human Engineering Test Plan details the proposed testing to demonstrate that the personnel-equipment/software combination can accomplish the intended operation and maintenance functions in accordance with system specifications. This plan serves as the principal means of planning for validating human performance requirements, accuracy of personnel selection criteria, adequacy of training, and acceptability of design of the personnel-equipment/software interface.
a. This data item description (DID) contains the format and content preparation instructions for a Human Engineering Test Plan resulting from applicable tasks delineated in the SOW.
b. This DID is related to DI-HFAC-80744B, "Human Engineering Test Report". This plan serves as the principal means of planning for validating human performance requirements, accuracy of personnel selection criteria, adequacy of training, and acceptability of design of the personnel-equipment/software interface.
c. This DID supersedes DI-HFAC-80743A.
Preparation Instructions
1General.The Human Engineering Test Plan shall detail the contractor's plan for gathering and analyzing data to show that the system, when fielded, will satisfy four criteria:
1.1All human performance requirements for operations and maintenance can be performed to an acceptable level or standard under conditions of expected use.
1.2The human performance requirements for operations and maintenance can be performed reliably by personnel reasonably representative of the military personnel who will ultimately perform them.
1.3Both the cost (in terms of all resources required) and some measure (based on human performance time and error data) of prospective effectiveness of the contractor's training program for operations and maintenance are known.
1.4The design of system hardware and software facilitates efficient, safe, and accurate human performance.
2Format.The Human Engineering Test Plan format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.
3Content.The Human Engineering Test Plan shall contain the following:
3.1Introductory information.Introductory information shall include the following:
3.1.1Title descriptive of each test to be conducted.
3.1.2Identification of equipment (or concept) being tested.
3.1.3Statement of the task groups (or portions thereof) being reported.(A list, in sequential order, of all the discrete performance tasks--with critical tasks identified--which will be required of each person in the system).
3.1.5Objective(s) of tests (if different from paragraph 3a-4).
3.2Test design.Identification of test conditions, performance measures, sample sizes, and sequence of test events.
3.3Test methods and controls.Description of procedures to be followed in conducting each test. Explanation of how environmental variables and other factors which could affect the performance measures will be controlled or described, including where relevant:
3.3.3Shock and vibration.
3.3.4Air temperature and humidity.
3.3.6Exposure to toxic or hazardous substances.
3.4Test participants.General description of the personnel population from which test participants will be selected. Identification and justification of test participant selection criteria. Identification of methods by which data describing actual test participants will be gathered, including where relevant:
3.4.4Body dimensions relevant to performance tasks.
3.4.7Existence of physical disabilities.
3.4.8Educational and work experience.
3.4.9Prior experience relevant to performance tasks.
3.5Training of test participants.
3.5.1Type and amount (in hours) of system-specific pretest training planned for test participants.
3.5.2Any end-of-training comprehension test administered to test participants before test data-gathering begins.
3.6.1Description of mockup or equipment on which tests will be conducted (including material to be used and type of fabrication, dimensions, and cross-reference to drawings or sketches).
3.6.2Identification of other, non-system equipment involved in tests (including all equipment to be worn, carried or otherwise borne on the body of test participants such as weapon, communications equipment, headgear, survival equipment, protective mask and night vision equipment).
3.7Data collection.Detailed description of the instrumentation or other means which will be used to obtain raw data on each of the performance measures. Identification of forms, if any, that will be used for recording data. Description of the frequency and means by which data on environmental variables and other extraneous factors will be collected.
3.8Data reduction.Detailed descriptions of techniques to be used for transformation and combination of raw data, statistical techniques to be employed and assumptions pertaining to the use of each (e.g., normally distributed), and confidence levels selected.
3.9Data analysis.Explanation of how the data collected will be used in:
3.9.1Human performance error analysis (e.g., "calculating operator error rate for mission-critical tasks").
3.9.2Identifying incompatibilities among human performance and equipment.
3.9.3System safety analysis.
3.9.4Logistics and maintainability assessment(s).
3.9.5Calculating system reliability, availability, and effectiveness.
3.10Test reporting.Identification of tests for which a "Human Engineering Test Report", DI-HFAC-80744, is planned and tentative date(s) of initial submission.