DI-ILSS-80908
Special Production Tooling List/Design Concept
The Special Production Tooling List/Design Concept describes the manufacturer and intended use of special tooling, giving the procuring activity a basis for evaluating requirements to ensure competitive procurement of interchangeable parts.
Approval DateOctober 6, 1989
AMSC NumberA4841
Preparing Activity—
Project Number—
OPRA/MICOM
DTIC Applicable—
GIDEP Applicable—
Limitation—
Applicable Forms—
Approval Limitation—
Form VersionMAR 87
DID Formatdd_form_1664
963C CompliantNo
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Description & Purpose
3.1 The Special Production Tooling List/Design Concept provides a description of the manufacturer and intended use of the special tooling.
3.2 This list provides the procuring activity a basis for evaluating special tooling requirements to ensure competitive procurement of interchangeable parts.
Application & Interrelationship
7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
7.2 This DID supersedes DI-P-1613.
Preparation Instructions
10.1Format.The Special Production Tooling List/Design Concept format shall be in alpha-numeric part number order.
10.2Content.The Special Production Tooling List/Design Concept shall include the following for each special tool required to manufacture interchangeable parts:
10.2.2Name and address of manufacturer.
10.2.3Physical description.
10.2.4Functional description which shall also include a sketch of the area of the end item where the special tooling shall be used.
10.2.5Commercial and Government Entity (CAGE) code.
10.2.6Potential user (identify all anticipated users in production).
10.2.7Planned production rate for tool to support.
10.2.8Quantity of tools required to support total production effort.
10.2.9Equipment options (including cost).
10.2.10Concept sketch of tool.
10.2.11Acquisition schedule.
10.2.12Alternatives considered.
10.2.12.1Commercial equipment compared to proposed special tooling design.
10.2.12.2Tooling used during validation stage or modification to existing special production tooling.
10.2.13Cost effectiveness of proposed tooling compared to the use of alternatives for:
10.2.13.3Proofing cost of the special tooling.
10.2.14Estimated life of tool during production.
10.2.15Future use.State whether the special tooling shall be used "as is" for production, modified for production or replaced for production. Include the following:
10.2.15.1Rationale for modifications and replacements.
10.2.15.2Special requirements needed if modifications are made to the special tooling.