DI-MGMT-80061A
Engineering and Technical Services Accomplishment Report
The Engineering and Technical Services Accomplishment Report records progress on engineering tasks, services, and contractor internal control schedules used to manage and control Engineering Services activities.
Approval DateMarch 28, 1991
AMSC NumberA6091
Preparing Activity—
Project Number—
OPRA/MICOM
DTIC Applicable—
GIDEP Applicable—
Limitation—
Applicable Forms—
Approval Limitation—
Form VersionAPR 89
DID Formatdd_form_1664
963C CompliantNo
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Supersedes
DI-MGMT-80061DI-MGMT-80893
Description & Purpose
3.1 The Engineering and Technical Services Accomplishment Report records progress on engineering tasks, services, and contractor internal control schedules utilized to manage and control the Engineering Services activities.
3.2 The report provides advice, instruction, or training on how to install, maintain, and operate weapons, equipments and systems in a high state of readiness.
Application & Interrelationship
7.1 This Data Item Description (DID) contains the data format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
7.2 This DID shall be used in conjunction with DI-MISC-80748, Engineering Services Memorandum.
7.3 This DID supersedes DI-MGMT-80061 and DI-MGMT-80893.
Preparation Instructions
10.1Format.The Engineering and Technical Services Accomplishment Report format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.
10.2Content.The Engineering and Technical Services Accomplishment Report shall (a) cover the progress on each active Engineering Services Memorandum (ESM) and (b) delineate the following:
10.2.2Contract services authority date and serial number.
10.2.3Location where services were performed.
10.2.4Names of contractor personnel performing the services.
10.2.5Date services were performed and number of man days or man hours experienced.
10.2.6Name of the procuring activity's technical representative (or designated technical representative) present during performance of the services.
10.2.7Table of Contents (List all ESMs).
10.2.8A statement of each ESM summarizing the work accomplished and objectives attained to the last day of the reporting period.This statement shall also reflect progress versus planned milestone objectives and projections of work accomplishment.
10.2.9A statement as to whether any change to the item or procedures under consideration will necessitate changes on other system hardware or procedures.Any changes to other system hardware or procedures, which are necessitated by the proposed change, shall identify the item(s) or procedures affected, the estimated cost, the part number and all other pertinent information.
10.2.10A summary of the work objectives and work to be accomplished during the next reporting period.
10.2.11A statement on the reasons for any delay of work which occurred and the effect of the delay on the overall program.Whenever delays occur, this statement shall furnish a revised completion date and cost of the ESM.
10.2.12A statement of significant problems encountered and corrective action taken or recommended.
10.2.13Recommendations, if any.
10.2.15A listing of trips made during the reporting period in conjunction with fulfilling the requirements of this contract.This listing shall state where and when the trip was made, who was contacted, state the objectives of each trip and the degree of accomplishment of each objective.
10.2.16A summary of any recommended change revisions to existing technical manuals and plans.Describe the contractor's technical efforts and list any required spare parts installed in the repair or adjustment of any equipment or system.
10.2.17When an ESM contains repetitive work (e.g., preparation or revision of new drawings or specifications, packaging data sheets, Engineering Change Proposals (ECP), etc.), a summary of work units, by relative major and minor effort shall be included in the report for such ESMs.The summary shall provide the number of units received and completed during the reporting period, and the cumulative number of units completed to date.
10.2.18When an ESM is completed or cancelled, the Engineering and Technical Services Accomplishment Report shall state that this completes all effort under this ESM.