DI-MGMT-82060
Shipboard Interferences for Removed and Install Report
Documents that the contractor has removed and reinstalled interferences that are within the scope of work.
Approval DateOctober 3, 2016
AMSC NumberN9709
Preparing ActivitySH
Project NumberMGMT-2016-047
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
This DID will document that the contractor has removed and reinstalled interferences which are within the scope of work.
This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
Preparation Instructions
1Format.The report shall be in the contractor's format.
2Content.The report shall contain the following:
2.2Item description (e.g., piping size, valve number, cable identification, gage number, etc)
2.4Previously damaged and deteriorated interferences
2.5Interferences removed/installed.