DI-MGMT-82077
Equal Component Report
This DID is used when the contractor chooses to install an equal component in lieu of the component specified by the Work Item.
Approval DateOctober 3, 2016
AMSC NumberN9728
Preparing ActivitySH
Project NumberMGMT-2016-067
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
This DID will be used for each instance when the contractor chooses, to install "an equal component" in lieu of the component that is specified by the Work Item.
This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
Preparation Instructions
1Format.The report shall be in the contractor's format.
2Content.The report shall provide data to compare the equal component to that specified including the following:
2.1Name and hull number of ship
2.4Paragraph numbers including standard item paragraph number
2.5Physical dimensions of each
2.6Bolting pattern required to install the component
2.8Size, location, and type of miscellaneous service connections
2.9Modifications required for installation
2.10Results from the comparison of the characteristics, i.e., gallons per minute, cubic feet per minute, and temperature range