DI-NDTI-80603A
Test Procedure
The Test Procedure identifies the step-by-step testing operations, equipment, conditions, parameters, and pass/fail criteria for developmental, qualification, or acceptance testing.
Approval DateNovember 14, 2006
AMSC Number7637
Preparing Activity—
Project Number—
OPRNS/DA023
DTIC Applicable—
GIDEP ApplicableNone
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatdd_form_1664
963C CompliantNo
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The test procedure identifies the step-by-step testing operations to be performed on items undergoing developmental, qualification, or acceptance testing. It identifies items to be tested, the test equipment and support required, the test conditions to be imposed, the parameters to be measured, and the pass/fail criteria against which the test results will be measured. The document is a compilation of individual test procedures for related elements of a system, subsystem, or equipment.
This Data Item Description (DID) contains the format and content preparation instructions for each tech data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable to contracts requiring tests to be performed for the purpose of developmental or environmental evaluation, acceptance testing, and item qualification testing.
This DID supersedes DI-NDTI-80603.
Preparation Instructions
2FormatThe test procedures shall be in contractor's format on 8 1/2 x 11 inch paper. It shall be bound in such a manner that pages may be removed or inserted without damage or mutilation.
3ContentThe test procedure shall contain the following:
3.1.1Cover and title pageThe following information shall be included on the cover and title page:
3.1.1.2Revision date (if applicable)
3.1.1.3Procedure document identification number
3.1.1.5Contractor's name and address
3.1.1.6Type of procedureIncluding purpose (e.g., first article test, developmental evaluation, qualification, environmental (specify), acceptance, or other)
3.1.1.7Identification of the system, subsystem, or equipment to be tested.
3.1.1.8Security classification (if applicable)
3.1.2Record of changesA record of change pages shall be included to provide for tracking of changes to the test procedures.
3.1.3Table of contentsA table of contents is required when more than one test procedure is included in the test procedures document. It shall identify the page location of each procedure number, procedure title, and related equipment nomenclature.
3.2Body of documentFor each test procedure, the following information is required.
3.2.1Procedure numberEach procedure shall have a unique number assigned to it.
3.2.2Title of procedureThe title should relate to the purpose of the test.
3.2.3IntroductionThe following shall be addressed in the introduction:
3.2.3.1Purpose of test(As specified in the contract tasking document).
3.2.3.2System, subsystem, or equipment to be testedThe following identification shall be provided.
3.2.3.2.2Model or part number
3.2.3.2.3Type of test item (prototype, production item, laboratory model, etc)
3.2.3.2.4Applicable specification
3.2.3.3Test requirementsIncluded the following, each related to the prescribing contract requirement paragraph (specification, standard, plan, or work statement)
3.2.3.3.1Required tests, and parameters to be measured.
3.2.3.3.2Performance requirements, acceptance of compliance limits, and environmental criteria.
3.2.3.4Referenced documentsA list by title, number, date, and source of those documents cited in the test procedure.
3.2.4Required test equipmentIncludes the following for each piece of test equipment required to perform the procedure:
3.2.4.2Use of test equipment
3.2.4.3Model number (if applicable)
3.2.4.4Manufacturer (if mandatory)
3.2.4.5Accuracy and calibration requirements
3.2.4.6Range or spectrum of measurements required
3.2.5Table of testsThis table lists each test performed under the procedure in the sequence it is to be performed, identified to the procedure paragraph and the related specification/contract requirement.
3.2.6Step-by-step procedureThe following shall be included for each step of the test procedure:
3.2.6.1Test set-up diagrams, including test equipment connections.
3.2.6.2Input and output instrumentation points.
3.2.6.3Test item operating limits and test conditions to be imposed.
3.2.6.4Performance parameters to be measured.
3.2.6.5Step-by-step operations to obtain the required data.
3.2.6.6Caution and safety warnings as appropriate.
3.2.7Data sheetsData sheets shall be included with the procedure, or be separately attached at the end of all procedures. They shall provide for:
3.2.7.1Identification of item tested, including model and serial numbers.
3.2.7.2Recording of test measurements
3.2.7.3Identification of required or objective performance values, with tolerances.
3.2.7.4Identification of applicable procedure paragraphs.
3.2.7.6Signature of technician or inspector performing the tests.
3.2.8Support requirementsAny special support requirement would be included in this section, such as:
3.2.8.1Use of special facilities or test ranges.
3.2.8.2Personnel requirements (numbers, types, qualifications).
3.2.8.3Unusual electrical, hydraulic, pneumatic, etc, requirements
3.2.8.4Support equipment requirements.
Schema v3.0Community-maintained · Verify against ASSIST