The Verification Test Report documents the results, procedures, and analysis of HEMP-protection subsystem verification testing performed under MIL-STD-188-125, enabling Government evaluation and certification of a facility's or system's HEMP hardness.
The Verification Test Report applies to both parts of military standard MIL-STD-188-125, High-Altitude Electromagnetic Pulse (HEMP) Protection for Ground-Based Facilities Performing Critical, Time-Urgent Missions. This DID applies to fixed facilities in accordance with Part I (MIL-STD-188-125-1A) and to transportable systems in accordance with Part II (MIL-STD-188-125-2). This DID contains the format, content, and intended-use information for the data deliverable resulting from the verification-test tasks performed in accordance with section 4.4.3 and Appendices B and C of each part of MIL-STD-188-125. This DID also identifies the same categories of information required for the threat-level illumination verification-test tasks described in Part II's Appendix D, as applicable.
The purpose of verification testing the HEMP-protection subsystem (HPS) is to demonstrate that the installed protection provides the required HEMP hardness. These tests are performed after the construction and acceptance testing are complete and after the equipment is installed and functioning to determine if the operational system suffers mission-aborting damage or upset due to simulated HEMP excitations. Verification is normally a Government-conducted test and is not part of a facility construction contract.
The Verification Test Report documents the test's results of the HPS' performance, and also describes the test-execution, data-recording, analysis, inspection, and reporting procedures used by the contractor to assess and document these results. This report includes a discussion of recommended corrective actions, if needed. The report provides the means for the Government to evaluate and certify the HPS' performance results, in that the report demonstrates the HPS' compliance with respect to MIL-STD-188-125's verification-test pass and fail requirements. The Department of Defense's HEMP-certification authority requires that a documented verification test report be submitted as part of a HEMP-certification request package for a facility or system.
If a portion of the HPS' components has already been tested by a previous test program, then documentation of those previous tests, including reports and test data, is attached as an appendix.
Final data from the report will be applied to subsequent re-verification planning and testing efforts, and will be applied to data item description DI-NUSU-82343 - MIL-STD-188-125 Hardness Maintenance (HM) and Hardness Surveillance (HS) Plan.