The RS105 Test Plan documents the test-execution, data-recording, analysis, inspection, and reporting procedures used by contractors to assess and document MCS performance during MIL-STD-461 RS105 radiated immunity testing.
The RS105 Test Plan applies to both parts of military standard, MIL-STD-188-125 High-Altitude Electromagnetic Pulse (HEMP) Protection for Ground-Based Facilities Performing Critical, Time-Urgent Missions. This DID applies to fixed facilities in accordance with Part I (MIL-STD-188-125-1A) and to transportable systems in accordance with Part II (MIL-STD-188-125-2). This DID contains the format, content, and intended-use information for the data deliverable resulting from the radiated immunity RS105 test tasks described in section 5.8.1 of each part of MIL-STD-188-125, as applicable.
The purpose of RS105 testing the first article of every MCS installed outside the HEMP-protection subsystem's (HPS') low-risk electromagnetic barrier is to help ensure that the MCS, and any associated special protective measures (SPMs), will provide sufficient hardness to HEMP's radiated-threat environment. The RS105 test procedures, as codified by MIL-STD-461, provide some of the baseline information for assuring that the given MCS, with any SPMs, is adequate to pass HEMP-verification testing.
The RS105 Test Plan describes the test-execution, data-recording, analysis, inspection, and reporting procedures to be used by the contractor to assess and document the results of the MCS performance. For each individual MCS to be immunity tested per MIL-STD-461 RS105, an individual test plan shall be prepared. The plan provides the means for the Government to understand and duplicate methods used by the contractor to demonstrate the MCS' HEMP-protection performance with respect to MIL-STD-461's pass and fail requirements and MIL-STD-188-125's RS105-test requirements.
If the MCS has already been RS105 tested within seven years prior to its installation at the facility or the system, then documentation of those previous tests, including plans, reports, and test data, is attached as an appendix.