DI-PSSS-82054A
Logistics Composite Model Analysis Toolkit (LCOM ATK) Study
The LCOM ATK Study describes a full weapon system in terms of reliabilities, maintenance, manpower, spares, support equipment, facilities, and flying schedule for use in Monte-Carlo trade studies.
Approval DateApril 28, 2023
AMSC NumberF10391
Preparing Activity11 (AFLCMC/EZJS)
Project NumberPSSS-2021-005
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The Logistics Composite Model Analysis Toolkit (LCOM ATK) Study describes a full weapon system in terms of component reliabilities, maintenance tasks, manpower, spare parts, support equipment, facilities, and flying schedule. When this study is used in a Monte-Carlo simulation it provides a means to run trade studies on manpower, sparing, or component reliabilities, and to determine their impact on fleet availability and ability to meet sortie requirements. The LCOM ATK is developed and managed by the Air Force Life Cycle Management Center (AFLCMC) engineering home office (AFLCMC/EZJS) at Wright-Patterson Air Force Base.
a. The purpose of this Data Item Description (DID) is to develop and deliver an LCOM ATK model study.
b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
c. This DID is used in conjunction with DI-PSSS-82055, Logistics Composite Model Analysis Toolkit (LCOM ATK) Study Input Plan. (Copies of this document are available online at https://quicksearch.dla.mil.)
d. This DID supersedes DI-PSSS-82054.
Preparation Instructions
1Reference documents.The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2Format.The files which comprise the LCOM model shall be in LCOM ATK native format. All files required to run and operate the model shall be in an electronic government-readable container format (i.e., *.zip).
3Content.The LCOM ATK Study shall contain the following:
3.1LCOM ATK Database file (.dat)
3.2LCOM ATK Change Card(s) (.chg)
3.3LCOM ATK Seeds files (.sds)
3.4LCOM ATK Output files (as applicable):
3.4.1Main Single Repetition FilesPerformance Summary Report (PSR) File (.psr), Delimited PSR (DSR) Workbook (dsr.xlsm), Display Workbook (dply.xlsm), Mission Workbook (misn.xlsm), Matrix Workbook (mtrx.xlsm), Parts Workbook (parts.xlsm), Support Workbook (support.xlsm), and Time Workbook (time.xlsm)
3.4.2Main Production FilesMerged DSR Workbook (mdsr.xlsm), Merged Mission Workbook (mmisn.xlsm), Merged Matrix Workbook (mmtrx.xlsm), Merged Parts Workbook (mparts.xlsm), Merged Support Workbook (msupport.xlsm), and Merged Time Workbook (mtime.xlsm)
3.5Distribution StatementThe applicable Distribution Statement, as necessary, in accordance with Department of Defense Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, Enclosure 4. (Copies of this document are available online at https://www.esd.whs.mil/DD.)
3.6Classification markingsThe applicable classification markings, as necessary, in accordance with Department of Defense Manual (DoDM) 5200.01, Volume 2, DoD Information Security Program: Marking of Information. (Copies of this document are available online at https://www.esd.whs.mil/DD.)
Schema v3.0Community-maintained · Verify against ASSIST