DI-QCIC-82525
Acquisition and Sustainment Data Package (ASDP) Requirements for Production Part Approval Process (PPAP)
Defines the aviation and defense process requirements for the Acquisition and Sustainment Data Package (ASDP) Requirements Production Part Approval Process (PPAP), which confirms the production process consistently fulfills customer requirements.
Approval DateJune 16, 2026
AMSC Number10644
Preparing Activity11 (AFLCMC/EZSM)
Project NumberQCIC-2025-003
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable FormsNone
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Related
DI-SESS-80776DI-SESS-81000DI-SESS-82351
Application & Interrelationship
—
Use & Relationship
Defines the aviation and defense process requirements for the Acquisition and Sustainment Data Package (ASDP) Requirements Production Part Approval Process (PPAP). PPAP confirms that the production process has demonstrated the ability to produce products that consistently fulfill customer requirements.
This Data Item Description contains the content and intended use of information for the data deliverable resulting from the work tasks described in the solicitation.
Preparation Instructions
1Reference documents.The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
ASME Y14.41, Digital Product Definition Data Practices
Copies of ASME documents are available online at https://www.asme.org/.
ISO 9000, Quality Management Systems
SAE-AS6500, Manufacturing Management Program
Copies of ISO documents are available online at https://www.iso.org/.
SAE-AS9100, Quality Management Systems - Requirements for Aviation, Space, and Defense Organizations
SAE-AS9102, Aerospace First Article Inspection Requirement
SAE-AS9103, Variation Management of Key Characteristics
SAE-AS9110, Quality Management Systems - Requirements for Aviation Maintenance Organizations
SAE-AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process
SAE-AS13004, Process Failure Mode and Effects Analysis (PFMEA) and Control Plans
SAE J1739, Potential Failure Mode and Effects Analysis (FMEA) Including Design FMEA, Supplemental FMEA-MSR, and Process FMEA
Copies of SAE documents are available online at https://www.sae.org/.
DI-SESS-80776, Technical Data Package (TDP)
DI-SESS-81000, Product Design Data and Associated Lists
DI-SESS-82351, Acquisition and Sustainment Data Package (ASDP) Engineering Design Data and Associated Lists (EDDAL)
Copies of documents are available online at https://quicksearch.dla.mil/.
2Format.The contractor's Production Part Approval Process (PPAP) data package must adhere to AS9145 Appendix D format, utilizing PDF-based forms for submission. Required data shall be mapped to model-based requirements and formatted as specified in the contract.
When adopting a model-based format, leverage the Department of Defense (DoD) and industry standard architecture frameworks such as the DoD Architecture Framework (DoDAF) or the Unified Profile for DoDAF/MoDAF (UPDM). Employing Systems Modeling Language (SysML) or the Unified Architecture Framework (UAF) is recommended to maximize information transferability, understandability, and reuse.
3Content.The PPAP addresses the content specified in AS9145, Section 5, Appendix C, and Appendix D. Criteria and Criteria Explanations are listed below to help clarify the submission requirements. Data submissions include the following:
Note: Instructions to complete Production Part Approval Process (PPAP) for approval are described in AS9145.
Additional Factors:
3.1Additional information for content can be found in AS13004, Process Failure Mode and Effects Analysis (PFMEA).
3.2Items determined not to be applicable (N/A) shall be explicitly identified as such in the contractor's submission.
3.3To align PPAP requirements with the specific article's scope and complexity, utilize DD Form 1423, Contract Data Requirements List, for tailoring purposes.
3.4If supplier PPAP submissions are required, this requirement shall be explicitly stated in the solicitation.
Figures

Figure Table 1. Production Part Approval Process File Contents (page 1 of 3)

Figure Table 1. Production Part Approval Process File Contents (page 2 of 3)

Figure Table 1. Production Part Approval Process File Contents (page 3 of 3)
Schema v3.0Community-maintained · Verify against ASSIST