DI-SCRE-82399
Anti-Tamper Plan
Specifies the format and content preparation instructions for an Anti-Tamper (AT) Plan documenting the lifecycle planning, design, verification, and validation of AT architecture and implementation to protect Critical Program Information.
Approval DateOctober 25, 2022
AMSC Number10363
Preparing ActivityOSD-RS
Project NumberSCRE-2022-017
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The Anti-Tamper (AT) Plan documents the lifecycle planning, design and verification and validation of AT architecture and implementation from concept development through final product performance evaluation and through sustainment. The plan enables the program to make informed decisions to plan for and address the protection of Critical Program Information (CPI).
a. The AT Plan, when complete, will also consist of an AT Verification Plan which contains information related to the verification and validation of the AT architecture and design.
b. This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
Preparation Instructions
1Reference documentsThe applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
1.1Anti-Tamper Plan Template(https://at.dod.mil/policy, CAC-enabled or account required)
1.2Anti-Tamper Verification Plan Template(https://at.dod.mil/policy, CAC-enabled or account required)
2FormatThe Initial and Final AT Plan shall be submitted in the AT Plan Template format. The Concept AT Plan can be submitted in contractor format. Plans requiring the use of the AT Plan Template will only be accepted in the most up-to-date format found on the AT Executive Agent website at https://at.dod.mil. The AT Plan shall conform to the following:
2.1The report and all attachmentsThe report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink.
2.2Text shall be prepared on standardText shall be prepared on standard letter size paper (8 1/2 x 11").
2.3Additional attachments shall be fully identifiedAdditional attachments shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report.
2.4Security classification and distribution markingsSecurity classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable.
3ContentThe AT Plan shall contain the following:
3.2AT Verification Plan(to be included as part of the AT Plan as appropriate).
3.3Any additional attachments that may be includedAny additional attachments that may be included as part of the AT Plan as updated throughout the product's lifecycle.
Schema v3.0Community-maintained · Verify against ASSIST