Describes the Installation Completion Notification used to report contractor field accomplishment of retrofit changes per an approved Engineering Change Proposal for Government configuration status accounting.
An Installation Completion Notification (ICN) is used to report field accomplishment of retrofit changes by contractor personnel as required by an approved Engineering Change Proposal (ECP). The notification is provided to the Government when the Government is maintaining the configuration status accounting information for the configuration of units in the operational inventory.
a. The reporting of the installation of retrofit kits in the field by the contractor during the acquisition phase and prior to the end of operational test and evaluation is required to verify the status of delivered configuration items subsequent to Government product acceptance.
b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside USA]).
c. This DID supersedes DI-SESS-81245B.