DI-SESS-81613A
Reliability and Maintainability (R&M) Program Plan
Describes the Contractor's Reliability and Maintainability (R&M) program, including Built-in Test (BIT) procedures, controls, and flow-down provisions, giving the contracting activity a basis to evaluate the program and verify compliance with specified R&M requirements.
Approval DateJuly 15, 2014
AMSC NumberN9465
Preparing ActivitySH/NUWC-NWPT
Project Number—
OPR—
DTIC ApplicableYes
GIDEP ApplicableYes
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
This plan describes the Contractor's Reliability and Maintainability (R&M) program, how it will be conducted and the requirements, controls, monitoring and flow down provisions levied on Subcontractors and Vendors. It describes the R&M, including Built-in Test (BIT), procedures and tasks to be performed and their interrelationship with other system related tasks. The principal uses are to provide the contracting activity a basis for review and evaluation of the Contractor's R&M program and for determining contractual compliance to the specified R&M requirements.
This Data Item Description (DID) contains the format, intended use information, and content preparation instructions for the data product generated by the specific and discrete task described in the contract.
This DID should be tailored appropriately to each program.
This DID replace DI-SESS-81613.
Preparation Instructions
1FormatThe Reliability and Maintainability (R&M) Program Plan shall be in the contractor's format.
2ContentThe R&M Program Plan shall identify and describe the activities planned by the Contractor for implementation of the R&M program, and shall include:
2.1Organizational chartproviding visibility into the resources, management and organizational structure of those responsible and accountable for the conduct of Reliability, Maintainability and BIT tasks.
2.2Identification of the quantitative and qualitative R&M and BIT requirements and verification methodsspecified in the solicitation or contract.
2.3List of required R&M, and BIT Tasks (CDRLs)with description and corresponding reference to the sections in the solicitation or contract.
2.4Integrated schedule for conducting all reliability, maintainability, and BIT tasksincluding the relationship to engineering design reviews and program milestones (for example, systems requirements review, preliminary design review, critical design review, production readiness review, etc).
2.5Reliability growth planning curve(s)that was integrated with the program's master schedule, plotting reliability against test time (or life units) to meet the quantitative requirement(s) specified in the solicitation or contract. Also, include the rationale for the initial reliability, planned growth rate, test resources and growth model used.
2.6Description of how the R&M and BIT tasks(e.g. models, allocations, predictions, fault trees, critical items lists, failure mode, effects and criticality analyses, etc.), including those of subcontractors, that will be conducted and the procedures for comparing their status and results to plan.
2.7Design guidelines(e.g. Operational Mode Summary/Mission Profile (OMS/MP), Failure Definition Scoring Criteria (FDSC), derating, stress analysis, thermal models, etc.) to be used for the reliability, maintainability and BIT tasks (e.g. models, allocations, predictions, failure mode, effects and criticality analyses, etc.).
2.8List Government Furnished Informationnecessary to support R&M design, development, and test activities and identify the use of R&M data sources (e.g., service maintenance data collection systems).
2.9Description of the intended use of GIDEPto promote and facilitate the sharing of R&M information.
2.10Test and demonstrationsplanned for reliability, maintainability and BIT (e.g. accelerated tests, BIT demonstrations, Maintainability demonstrations).
2.11Interrelationships of reliability, maintainability, and BIT tasksincluding how the resulting data will be integrated with other system oriented tasks (for example, life cycle cost analyses, level of repair analyses, availability analyses, trade-off studies, etc).
2.12Failure Reporting Analysis and Corrective Action System processto be used as well as any other data collection requirements and procedures, including a sample of the failure analysis forms.