DI-SESS-82317
Industrial Base Program (IBP) Questionnaire
Describes the Industrial Base Program Questionnaire used by the contracting agency to ensure sufficient industrial capacity exists to meet potential wartime needs for defense systems, equipment, and component parts.
Approval DateMay 14, 2020
AMSC NumberN10180
Preparing ActivityAS
Project NumberSESS-2020-030
OPR—
DTIC ApplicableNo
GIDEP ApplicableNo
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The IBP Questionnaire will be used by the contracting agency to ensure that sufficient industrial capacity exists to meet potential wartime needs for defense systems, equipment, and component parts.
This Data Item Description (DID) contains format and content, and intended use information for the data deliverable resulting from the work task described in the contract.
Preparation Instructions
1Reference documentsNone.
2.1.2TitleIndustrial Base Program Preparedness Plan (IBP).
2.1.3Contract Number and CDRL
2.1.4Contractor's Name and Address
2.1.5Distribution Statement
3Content*Note: The report shall include all active production sonobuoy contracts for the contractor and shall be filled out separately for the each sonobuoy type (ex. AN/SSQ-36, AN/SSQ-53, AN/SSQ-62, AN/SSQ-101 and AN/SSQ-125, etc.
3.1What is the current daily run rate for this sonobuoy?(Note: "Current" is defined to mean at the time you prepare this questionnaire. It is recognized that this answer may vary from one CDRL submission to the next.)
3.2What is the maximum daily run rate for this sonobuoy that could be produced without incurring additional capital investment costs or requiring additional funding?(Note: Hiring additional personnel and working overtime is acceptable.).
3.3Based on the total piece part inventory currently on hand for this sonobuoy type, what is the least number of months it would take to deliver said inventory without incurring additional facility or capital costs?
3.3.1Upon this basis, how many sonobuoys currently under contract could be delivered?(Note: It is recognized that this may be a limited quantity due to Just in Time inventories/deliveries that may be in place.). Paragraph 3.3.3. below is intended to capture all remaining sonobuoy deliveries of this type.
3.3.2What is the least number of months it would take to deliver the remaining sonobuoys of this type that are currently under contract?(Note: It is recognized that this may be a limited quantity due to Just in Time inventories/deliveries that may be in place). Paragraph 3.3.3 below is intended to capture all remaining sonobuoy deliveries of this type).
3.3.3And how many remaining sonobuoys is that?(Note: This should be answered on the basis that ALL additional piece parts and materials are ordered so all remaining sonobuoys under contract for this sonobuoy type can be delivered. Furthermore, paying a reasonable fee to expedite part/material deliveries is acceptable.).
3.4What are the Critical components for this sonobuoy?(Note: "Critical" is defined as configured items included in the Product Control Document, those items requiring a special or non-standard process or historically long lead items. This may include foreign, single source, or sole source items as well as ones that may have inherent criticality that may lead to a material shortage; e.g., magnesium as a processed raw material for seawater batteries.).
3.5What are the longest lead-times for this sonobuoy?
3.6What is the estimated yearly minimal funding level necessary to maintain capability to produce this sonobuoy?
3.6.1With a production award for this sonobuoy type?
3.6.2What Minimum Sustaining Rate (MSR) quantity is being used for each sonobuoy type to determine this funding level?
3.6.3Without a production award for this sonobuoy type?
3.7What is the minimum yearly sustaining dollar level needed to maintain an adequate level of capability for producing both passive and active sonobuoys?General Question for Program (only needs to be answered once).