DI-SESS-82431
Ground Operation Procedures
Specifies the format and content for Ground Operations Procedures documenting contractor procedures that mitigate risk of loss or damage to Government Flight Risk Clause covered aircraft.
Approval DateJanuary 19, 2024
AMSC NumberN10450
Preparing ActivityAS
Project NumberSESS-2024-004
OPR—
DTIC Applicable—
GIDEP Applicable—
Limitation—
Applicable Forms—
Approval Limitation—
Form Version—
DID Formatfree_text
963C CompliantYes
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
Application & Interrelationship
—
Use & Relationship
The Ground and Flight Risk Clause (GFRC) (252.228-7001 MAR 2023) requires the contractor's full compliance with the version of the Combined Regulation/Instruction entitled "Contractor's Flight and Ground Operations" in effect from the time of contract award throughout the period of performance of the contract, as it pertains to their operations. Therefore, the requirement to develop and follow procedures that mitigate the risk of loss or damage to contracted aircraft is a contractual requirement and applies independently of the Government's assumption of risk via the GFRC. These procedures apply to contractor personnel whose duties include the operation, production, modification, development, or maintenance of any GFRC covered aircraft, and, if complied with, indemnifies contractors of liability to the extent specified by the clause. The term "covered aircraft" applies to aircraft that are covered by the Government's assumption of risk under the GFRC. The term cannot be modified except as provided within the GFRC or as provided at DFARS 201.4.
This Data Item Description (DID) directs the format, content, and intended use information for the data product resulting from the work task described by the Contract, Performance Work Statement (PWS), and DCMA INST 8210-1D, Chapter 3.
Preparation Instructions
1Reference DocumentsThe applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, will be as specified in the contract.
2FormatUse format as specified in DCMA INST 8210-1D, paragraph 3.8.2. If the element does not apply to the platform or project, annotate as Not Applicable for that section or paragraph.
3ContentThe Ground Operations Procedures (GOP) shall include the following:
3.1Explanatory pages with the following minimum information
3.1.1The Contractor and contract number(Cover page).
3.1.2The type of aircraft(Cover page).
3.1.3Date / Revision number(Cover page).
3.1.4Contractor and GGFR approval signatures(Signatures may be electronic) (Cover page).
3.1.5A continuous Record of Revisions pageto document required updates and other necessary changes throughout the life of the contract.
3.2Procedures BodyInclude procedures for all sections applicable to contracted operations from DCMA INST 8210-1D, Section 3, APPENDIX 3A and any other contract mandated Service guidance, instructions, or regulations. Refer to each applicable section of the Instruction (i.e., sections 3, 4, 5, 6, 7) for specific details and requirements to be addressed. Follow instructions in paragraph 3.8.2 if a Section or paragraph is not applicable to operations.